In manufacturing, most teams know the feeling of living with workarounds — spreadsheets patched onto old systems. But modernizing an MRP software system isn’t just about replacing software — it’s about shifting how a factory sees its own work, one step at a time.
This guide takes a realistic approach to change, moving at the pace that real life allows. Let’s go.
Step 1. Get a Good Look at the MRP System
Before you start updating your MRP system, take a really good, hard look at how the thing actually works. Many mid-sized manufacturers are still stuck on old-school manufacturing MRP systems installed way back when. They may still be chugging along, but they often create problems that you might not even be aware of.
Why integrity? When you’re working in a regulated sector, “data integrity” is basically a hard and fast legal requirement. When you modernise your MRP system, you can take advantage of some of the same tech that’s used in blockchain — principles like immutability for your most important records. Every change to a Bill of Materials or Quality Release gets a digital fingerprint and a hash — and that means you get a completely unchangeable audit trail that gives you rock-solid proof of compliance and makes regulatory audits a whole lot easier, because you can pinpoint exactly where your products came from and what went wrong.
So, the first thing to do here is figure out what exactly you want to assess, especially if you’re benchmarking against top MRP systems. What parts of the platform are you looking at — that’s things like inventory management, production planning, and how it hooks into your ERP system or financial software. Don’t forget to think about how users are actually interacting with the system, and what kinds of permissions they have. It’s a good idea to get some key people from IT, operations, finance, and compliance on board early on. You can be sure that each of them will have their own take on how well the system is working, and what potential problems might be lurking.
The Main Criteria
To make this work, you should come up with some clear criteria for what you’ll be looking for. These are things like:
- How well is the system running in terms of efficiency and speed
- How well can the system handle more data and scale up when needed
- Is the system secure and compliant with all relevant rules and regulations
- And how much is this system actually costing you in terms of maintenance and the like
What about the timeline? On average, for most mid-sized manufacturers, a good audit will take around 4-8 weeks. That can vary, depending on how complicated your system is and whether you have all the right documentation. Gather all the information you can about your current system. You want to make an inventory of all the different parts that make up your MRP system: software, hardware, databases, and anything else that’s relevant. Get all the documentation you can get your hands on, like user manuals and process maps. But if you’re missing some stuff, don’t be afraid to go out and ask the people who actually use the system for the lowdown on how it really works.
Data Trust
Take a good look at the data in your system and check for any out-of-date records or duplicates — they can both mess with your accuracy and turn people off from using the system. But can you actually trust the data? Trust in an MRP starts with figuring out what’s going on with the ‘noise’ in your old data. Rather than just spot-checking manually, use Bayesian demand modeling to dig into historical records. This math-based approach treats past inconsistencies as probabilities — not fixed mistakes — it helps identify where lead times or consumption rates have changed over the years and gives you a “cleanliness score” that tells you which datasets need a good scrub before they can be trusted to feed into the new system.
Technical Health
The technical assessment is usually centred on:
- How old is the tech stack, and is the vendor even still supporting it
- What’s the system like when it’s actually getting used in real life: is it chugging along or falling over?
- Can all the bits and bobs that need to talk to each other do so reliably
In this way, do a security review that takes in user access control, how people are authenticated, data encryption, and logging. Have a good rummage through compliance with whichever rules and standards apply to the business. Check the audit trails, how long they keep data for, and whether they can still report properly and meet the regulators’ standards
Finally, take a close look at the financial and operational impact of things. Work out the total running cost, including all that comes with running the system: maintenance, hardware, custom development, support, and training people on it. Check just how well the current system is helping with planning and execution processes — are there long delays, a lot of manual workarounds, and does the system hold back from being super responsive?
Where you can, test out your findings with a bit of testing: unit tests, integration tests, and the like. Running this old system in tandem with the new one will show you exactly how much better the new one is. A proper assessment helps you make a well-informed decision about whether to keep it, upgrade it, or bin it and move on.
Step 2. Plan the Solution
Once you’ve finished the audit and have a clear idea of just how limited that old MRP system is, you’re ready to pick a replacement system that’s going to do the trick and plan out how to get it up and running.
Cloud vs On-Prem: What Changes Operationally
By now, you’re probably thinking about things like cloud-first architecture and intelligence with a bit of AI thrown in. And whatever you choose, it’s not just about getting a new tech system in place — you want to make sure you’ve got continuity, that you can bounce back if things go wrong, and that you’ve actually got a system that will let you adapt to whatever changes come your way down the line.
If long-term control matters, the cleanest move is to commission a custom system from a reliable technology vendor. One that builds around your Unified Data Namespace instead of wrapping it inside a product boundary. In that model, the vendor delivers engineering, integration, and accountability—but the data layer, schemas, pipelines, and decision logic remain yours. The system evolves as your operations evolve, without renegotiating licenses or reverse-engineering someone else’s roadmap.
That’s the practical endgame of UDN-based modernization: technical independence backed by a partner who builds systems you own, rather than products you rent.
When it comes to choosing the new system, you should be taking a good, hard look at what you learned from that audit. The things that weren’t quite right with your old MRP system — are they still a problem? Are there still gaps in what it can do, data issues, spots where it doesn’t integrate well, or costs that are eating away at you? All of that stuff you found in Step 1 should be right at the front of your mind when you’re making your decision.
So what should you be thinking about? Well, for starters, you need to think about your company. How big are you? What kind of specific requirements does your industry have? How’s your budget looking? And how complex is all this going to be to get up and running? More often than not, a mid-sized manufacturer is going to find that the best bet is a cloud-based MRP system for small business or ERP — they cut down on what you need to worry about in the background, and they make it easier to get out of that old system.
Core selection criteria:
- Functional coverage. Ensure the solution fully supports core capabilities such as material requirements planning, bills of materials, inventory management, and forecasting. Demand-driven MRP is increasingly important, as it aligns planning decisions with actual consumption rather than static forecasts. Static stock buffers are the primary cause of both shortages and overstock. A modern MRP upgrade should include Reinforcement Learning (RL) agents that manage your Demand-Driven (DDMRP) zones. These agents run continuous “what-if” simulations in the background, automatically adjusting buffer sizes based on real-time market volatility and supplier performance. This shifts the system from a rigid calculator to a self-adjusting mechanism that protects your flow without constant manual tuning.
- Scalability and deployment model. Evaluate cloud-native versus on-premise deployment. Cloud solutions typically offer faster scalability, regular updates, and lower upfront infrastructure costs, which is especially relevant for growing manufacturers.
- Integration capabilities. The system should integrate cleanly with finance, customer management, and production technologies. Poor integration is one of the most common causes of manual workarounds and planning delays.
- Total cost of ownership. Look beyond license fees. Include migration effort, data cleansing, customization, training, and ongoing support. For mid-sized organizations, initial investment commonly falls within a mid-range budget, but long-term operating costs matter more than entry price.
- Security and compliance. Confirm alignment with applicable data protection and industry standards. In 2026, cybersecurity maturity and auditability are baseline expectations, not optional features.
- Vendor maturity and support. Assess the vendor’s track record with legacy migrations, ongoing product development, and customer support. Experience transitioning from older technologies is often a stronger indicator of success than feature lists.
Modern MRP selection should prioritize platforms that support Adaptive Policy Optimization. Utilizing Reinforcement Learning (RL), these systems don’t just set static stock buffers; they run continuous background simulations to find the optimal balance between inventory costs and service levels. This allows the system to autonomously adjust its own reorder points as market volatility shifts, ensuring that your planning logic evolves at the speed of your supply chain.
AI planning without the “black box”
Buyers often fear that AI-driven planning is a “black box” they cannot control. The solution is Grey-Box Modeling, which combines transparent engineering rules (like maximum machine load) with data-driven AI insights. During the planning phase, the system provides a “reasoning path” for its suggestions—for example, correlating a change in lead time with observed supplier performance trends. This transparency builds the necessary trust for your team to move away from manual spreadsheets and embrace automated orchestration.
Choosing a solution is not about finding the most advanced platform. It is about selecting a system that fits the organization’s operational reality today and can evolve with it over time. A disciplined selection process reduces implementation risk and sets the foundation for a controlled, predictable transition in the steps that follow.
Step 3. Configuring the Core: BOM, Routings, APS
The configuration phase is where expectations meet reality. For most teams, this is where the new MRP starts to ask direct questions about how things are really made, and how decisions happen on the ground. Any gap between process and practice surfaces here.
Most production environments have workarounds. Old BOMs aren’t always complete. People, not systems, often handle routings. The move to a modern MRP doesn’t erase that — it simply makes it visible.
What stands out during configuration is that every missing item or undocumented step becomes a ticket. The system relies on clarity. Product structures, quantities, resource assignments — all of it needs to be explicit. Where things were previously “close enough,” now they need to add up. This process isn’t about catching people out. It’s about building a base that supports consistent planning.
Master Data Work
Data work here is rarely glamorous. Master data from legacy systems needs review. Codes get checked, units of measure are confirmed, suppliers and lead times are updated. Sometimes the answer is clear. Often, it’s not. That’s common. Clarifying as you go is part of the job.
Routings draw out the real way work moves through the plant. Any reliance on memory or habit gets replaced by steps in the system. For teams used to handling change on the fly, this can feel restrictive. Over time, though, making each operation visible helps reduce firefighting. Bottlenecks aren’t hidden. They’re mapped.
APS: constraint-based scheduling
This is less about what could be done in theory and more about what’s possible with real capacity, real schedules, and real limits. The plan changes from hope to something the floor can actually deliver. Precision in APS depends on accurate routings that reflect physical reality. Implementing Grey-Box Modeling allows the system to combine documented engineering rules (White-Box) with real-world performance data (Black-Box). By embedding physical constraints—like machine thermal limits or tool wear curves—directly into the planning engine, the MRP gains a “physical intuition.” It stops scheduling impossible runs because it understands the fundamental mechanics of the shop floor, not just the numbers in the BOM.
Stabilize “MRP nervousness”
Why do plans collapse? Legacy MRP systems often suffer from “nervousness,” where small changes in demand trigger massive, chaotic shifts in production schedules. Modern configuration utilizes Reinforcement Learning (RL) agents to stabilize the plan. These agents run thousands of virtual “stress-test” scenarios in the background, identifying which demand signals require an immediate response and which are just noise. This results in a schedule that is both lean and resilient, reducing unnecessary setup changes and “firefighting” on the shop floor.
When demand shifts? Static scheduling rules crumble under high volatility. Advanced MRPs utilize Markov Decision Processes (MDP) within their Reinforcement Learning agents. This mathematical framework allows the system to make optimal sequencing decisions in environments where future demand is uncertain. By calculating the “expected value” of every possible production path, the system selects the schedule that maximizes long-term throughput even when facing unpredictable supplier delays or machine downtime.
Precision in scheduling requires more than just “standard hours.” Use Grey-Box Modeling to infuse your APS with physical intuition. By combining engineering laws (like machine thermal expansion or tool wear rates) with actual shop-floor data, the MRP gains a “physical” understanding of your constraints. This prevents the system from scheduling impossible runs, ensuring that the final production plan is mathematically optimized yet physically achievable on the shop floor.
Simulation mindset
Testing and simulation highlight where things don’t fit. These aren’t failures — they’re feedback. The aim isn’t to eliminate all exceptions, but to know exactly where they exist.
Modern MRP configuration doesn’t turn a business into a machine. It puts a mirror up to how production works, so the team can see where it’s strong, where it’s exposed, and where there’s room to close the gap between plan and reality. The more open the process, the more predictable the results.
Step 4. Data Cleansing and Migration Prep
You often get the feeling that this stage isn’t going to take as long as it actually does. The data looks alright, the system’s been chugging along for years, so migration should be pretty straightforward, right? But that’s not how it usually pans out. The team gets to see their own story in numbers: old dead codes, duplicate entries just lingering in the system, empty fields, and records that haven’t mattered in ages.
The big decisions during this time tend to fall into three main categories:
- What absolutely must move to keep things running
- What should be archived either for future reference or to prove someone’s been keeping an eye on things
- What’s just a waste of space and no longer provides any value
This is where the boundaries start to become clear. The system starts demanding answers where, before, a vague solution was enough. What used to be “oh, it’s in a spreadsheet somewhere” now needs to be named, looked at, and properly understood. The team has to decide which data is still worth keeping and which is just a lingering reminder of the past.
Mapping Legacy
Mapping is all about figuring out how the old setup fits in with the new way things work. Fields get renamed, units get standardised, and it’s not just about what the official documentation says — it’s also about how people actually used to use the data. There often feels like there could be a bit more speed, but every exception always takes the team back to the details again.
Data cleansing rarely goes smoothly. It forces the team to confront years of shortcuts — duplicate suppliers, vague quantities, fields no one fully trusts anymore. The work is slow, sometimes frustrating, but it’s also where confidence in the new system begins to form.
Why does this take so long? Manual data cleansing often becomes a bottleneck that delays go-live by months. By implementing Bayesian filtering algorithms, the system automatically identifies statistical outliers and “garbage” records in your legacy master data. Instead of reviewing every line, your team only audits the high-risk anomalies flagged by the AI. This “smart-cleaning” approach ensures that your new MRP starts with a high-fidelity database, reaching stable operational accuracy 5 times faster than manual migration projects.
Years of manual workarounds create “noisy” data that breaks new MRP logic. Instead of manual cleanup, apply Bayesian filtering to your legacy records. This algorithm identifies statistical outliers in lead times and consumption rates, flagging only the records that deviate from physical reality. By focusing your team on these specific anomalies rather than every line of code, you ensure the new system starts with high-fidelity parameters, reaching stable planning accuracy 5x faster than traditional migration methods.
Test Migrations
Test migrations are rarely going to work the first time around. You’ll get errors, mismatches, formatting issues… but these aren’t failures — they’re just a starting point for where you need to put more work in.
Documentation in this phase isn’t about filling out forms — it’s about having a safety net that you can refer back to later. Every decision, every step, every change gets recorded so the team can come back in the future and see how things were done. It keeps you on track and focused on fixing things rather than pointing fingers.
When the final migration is finally on the horizon, all that’s left is live data: up-to-date stock, current orders, and a team ready to go. The rest has either been archived or put aside for audit.
Data migration isn’t about creating some sort of perfect order. It’s about finding that clarity — what really works, what you really need, and how to keep the new system free from all the clutter.
Step 5. Integrating with the Shop Floor: IoT and Real-Time Monitoring
This is where the system really starts to become part of the everyday routine. As data starts to flow in from machines and sensors, that gap between planning and production starts to close up real quick. That’s usually the point where teams start taking a good, hard look around the plant, asking the really obvious but also really useful questions, like what actually happens during a typical shift, where are the hot spots of value creation, and how does all that equipment data even make its way to the team.
The first thing you need to do is get a handle on how things really work on the ground. Take a walk around the shop floor and ask yourself some basic questions: which machines need to send updates, which signals actually matter to the operators, and where do we need to get feedback in a hurry? What happens when you do that is you start to connect the pace of production to the rhythm of planning, and that’s a beautiful thing.
Closing the loop
Once data starts flowing in real time, the system stops feeling abstract. Operators notice small shifts during the shift, not after it ends. Patterns appear. Questions change. Instead of waiting for reports, the team starts reacting while there’s still time to act. The flow of information just gives everyone a different kind of awareness — a shared view of what’s going on and when it’s going down.
How real is real-time? True integration requires moving beyond slow PLC polling. By deploying Edge Analytics that monitor machine signals at frequencies up to 100 kHz, the system detects sub-millisecond anomalies—such as a spindle vibration drift or a laser flicker—that indicate an impending quality failure. This high-frequency data is processed at the Edge (gateway level) and fed back into the MRP as a “Closed-Loop” signal, allowing the system to immediately throttle production or reschedule a batch before scrap is even generated.
Integrating all those new data sources can sometimes mean revisiting some old habits. You’re talking about the operators, engineers, and managers all working together to figure out which signals are worth paying attention to and which can just be background noise. This process alone creates a kind of common language between the shop floor and the office, so every alert or trend points to a practical action.
As the team starts to interact with these dashboards in real time, last-minute scrambles tend to give way to a sense of calm. When a shift runs smoothly, or a small issue gets caught early, trust in the system just grows and grows. Over time, that flow of data starts to support new routines: planned maintenance, early response to change, and collaboration between production and planning. Most “real-time” systems actually have a significant lag. To achieve true synchronization, deploy Edge Intelligence directly on the production line. By processing acoustic and vibration signals at 100 kHz, the system detects micro-stoppages and efficiency drifts as they happen. This data is fed back into the MRP’s Adaptive Optimization Loop instantly. If a machine slows down, the MRP automatically recalculates the material arrival times for the next station, preventing downstream idle time and ensuring the production rhythm remains perfectly aligned with the digital plan.
Standard MRP updates often happen too late to save a batch. True synchronization requires Edge Intelligence monitoring signals at 100 kHz. By processing high-frequency acoustic and vibration data at the source, the system detects sub-millisecond anomalies—like a bearing drift or a micro-stoppage—and feeds this “Closed-Loop” signal back to the MRP instantly. This allows for an immediate schedule recalibration, preventing downstream idle time and keeping the entire plant aligned with the digital plan in real-time.
Each time you go through this process, you’re just adding to that shared understanding, and the team starts to use real-time signals to guide decisions, adjust schedules, and improve reliability. That connection between equipment, people, and the system creates this feedback loop where daily work becomes a whole lot more visible and predictable.
When the shop floor and the system start working together in harmony, planning and production just line up. The value is in everyone seeing the same signals and responding together. That journey from the first sensor to a more stable, transparent routine is often a small step at a time, but one that’s taken right alongside your team, day after day.
Step 6. Testing and Pilot Launch
Testing marks the moment where the new system starts to meet real life. The planning, configuration, and integration work now gets tested by the people and the processes that use them every day. For many teams, this is where the system finally moves from theory to practice.
A thoughtful rollout begins with a plan. Teams outline the key steps: what will be tested, which KPIs matter, and who is involved. Usually, this includes people from IT, production, finance, and operations. Automated tools help simulate everyday work, while compliance checks keep the project aligned with safety and audit requirements.
Can you prove it first? To de-risk the financial investment, perform Virtual Commissioning using a high-fidelity Digital Twin of your production facility. Before the physical “Go-Live,” run the new MRP logic against a virtual mirror of your plant. This allows you to simulate a year’s worth of production in days, identifying exactly how much the new system will improve OEE and reduce inventory carrying costs. By mathematically proving the ROI in a risk-free virtual environment, you provide your stakeholders with the certainty needed to move from pilot to full-scale rollout.
Use virtual commissioning via a high-fidelity digital twin. The greatest risk in MRP modernization is the “Go-Live” shock. To eliminate this, perform Virtual Commissioning using a Digital Twin of your entire operation. Run the new MRP logic against this virtual mirror to simulate months of production in just a few days. This dry-run identifies logic conflicts, integration gaps, and ROI bottlenecks before you switch over the physical plant, providing your stakeholders with a mathematically proven assurance that the new system will stabilize immediately.
Testing typically progresses through:
- Unit testing: which is when you test individual modules to make sure they’re working as they should
- Integration testing: where you test how different systems work together
- End-to-end and user acceptance testing: where you test everything from start to finish to make sure the system will really do what you want it to
Now, pilot launches are a great way to keep the risk manageable. You choose a single plant, department, or product group to be the first to get the new system. The old system and the new system will run in parallel, so you can compare the outcomes and see how it all works in practice. And the nice thing is, you’ll usually be able to spot any issues early on and fix them before more people get involved.
So, with a phased rollout, you can build momentum. You’ll start with the core modules, like planning, inventory, and production tracking, and once those are stable, you can then roll out the rest, like financials, advanced analytics, or IoT integrations. And with each phase, you just fold in the lessons you’ve learned into the next step, so you’re always getting better and better.
Go-Live Readiness
And then there’s the final countdown to go-live. This is where you make sure you’re ready for the switch, with a clear plan, updated data, and all the support you need for the people who will be using the new system. You rehearse the transition, so when the time comes, the first days on the new platform feel pretty steady.
And it’s not just about go-live, it’s about what happens next. Ongoing monitoring and feedback is key. You need to be able to watch the key metrics, see what’s working and what’s not, and catch any bugs before they become big problems. You can use predictive tools to spot early signs of trouble, and regular check-ins to turn feedback into improvements.
A phased rollout really is a more gentle way to introduce a new system. It gives teams time to learn and adapt, and to succeed in small, manageable steps, rather than trying to make one big leap. And each round of testing, each pilot, and each go-live just adds to the experience and confidence.
Step 7. Success Metrics and Ongoing Optimization
When the system moves into daily use, teams begin to notice what’s working differently. The focus shifts from setup and rollout to the question that matters most: “Are we getting the outcomes we hoped for?” This is where tracking and improvement become part of the routine.
Every company is different, and they end up finding their own way to measure success. For some, it’s all about getting orders out the door on time — a production plan that actually matches reality, and orders shipping when we say they will. For others, it’s getting inventory turning over faster, or just seeing a big drop in downtime. More and more teams are starting to pick up on trends on dashboards that used to be just a gut feel.
KPIs
Some common metrics we see include:
- How well does the plan match up with reality
- How accurate are our inventory levels and stock turnover?
- Our OEE and how much downtime we’re seeing
- How quickly are users adopting the system, and how quickly are they making decisions?
After go-live, a period of regular review settles in. Weekly and quarterly checks compare the new numbers with where things started. Teams look for gaps, not just to spot problems, but to find patterns, maybe an MRP setting needs tuning, or maybe a workflow feels clumsy for users. Root cause analysis moves from guesswork to something practical and specific.
Simulation-First Optimization
Optimization shouldn’t happen on the live line. Utilize a high-fidelity Digital Twin for Virtual Commissioning of new process changes. Before tweaking an MRP parameter or changing a production sequence, run the scenario through thousands of simulations in the virtual environment. This simulation-first approach identifies the exact settings that maximize OEE, allowing the team to “dry-run” every optimization step and guarantee a positive ROI before a single physical change is made.
As confidence builds, small adjustments turn into bigger steps. Settings in APS shift for better alignment, new features get tested, and extra training helps more people get value from the system. Over time, these cycles of review and update become just part of how work gets done.
Feedback from the floor often gives the clearest signal. Teams notice where the system saves time, helps spot an issue early, or supports decisions with more confidence. Sometimes, it’s as simple as fewer last-minute emergencies or a smoother handoff from planning to production.
When do people override? The most valuable data is the “why” behind human overrides. Implementing Active Learning loops allows the system to identify when a senior planner rejects an MRP suggestion. The system prompts for a reason, digitizes that expert intuition, and incorporates it into the next model update. This turns your MRP into a living Institutional Knowledge Base, ensuring that the specialized expertise of your best people is captured and automated rather than lost to retirement or turnover.
Improvement isn’t a side project — it’s just how the system grows and adapts alongside the business. With every new audit, update, or lesson, the platform stays relevant, resilient, and able to meet whatever new demands come up. Over time, the business starts to feel less reactive and more prepared, with a system that not only keeps up but actually helps guide the next round of progress.
Sum Up
Progress rarely comes from big leaps.
It comes from routines that stick — one fix that holds, one cycle that runs cleaner, one lesson the team actually keeps.
In the end, the strength of the system matches the clarity of the work behind it. When teams stay curious, keep measuring, and keep adapting, each round of change leaves the operation more resilient and ready for what comes next.
Frequently Asked Questions
-
How do you avoid the hidden migration pitfalls that only turn up when you're ready to go live?
To be honest, no migration is ever trouble-free, and some of the biggest risks aren’t always clear in a checklist. You often only find out about problems — the ones that seem impossible to predict, like unexpected data tricks or overlooked workflows — the hard way, when actual transactions start flowing. The best way to get a handle on these issues before it’s too late is to run the system in a parallel universe for a bit before you actually switch over. By doing a pilot run or a test phase, you give yourself a chance to spot any problems and fix them while you still can. When the people who use the system on a day-to-day basis go through their routine in the new system, it makes it much easier to find what’s missing and sort out the issues. And of course, it helps to share the lessons you learn with other teams as you go along, so the next phase of the rollout goes more smoothly and people start to trust that this thing is going to work out.
-
What do you do when production has 'requirements' that the standard ERP scenario just can't meet?
There’s rarely a factory that fits the textbook. Every operation finds places where standard ERP tools need extra help — custom data from a legacy line, a unique workflow, or IoT signals that don’t fit the default template. Here, it helps to start with the problem, not the system. Spend time on the floor, understand what makes that process unique, and only then shape the integration. Sometimes, a lightweight bridge or a focused middleware tool solves the need without heavy customization. Other times, teams develop small, targeted automations in parallel with the ERP. The key is to keep solutions practical and visible — something people can adjust as the process evolves, rather than building a black box no one wants to touch later.
-
Which metrics really matter for ROI after go-live, and how do you read them to spot real progress or hidden problems?
To be honest, the real benefits of a new system rarely jump out at you in the first set of graphs and charts. At first, you might even see some numbers going up and down as people get used to the new way of doing things. But the numbers that really tell the story are the ones that track things over a long period of time — on-time delivery, inventory levels, downtime… as well as user adoption. It’s also useful to look at patterns and trends rather than just focusing on short-term gains. For example, if you’re seeing a steady reduction in downtime, that’s a good sign, or if you’re managing to get your inventory levels both leaner and more reliable at the same time. And when people on the floor start trusting the data and making decisions more quickly, that’s a good sign that the investment is actually making a difference. And so on a regular basis, you should be getting the team together to talk about what’s working and what’s not, and how you can use the data to drive improvements.