Edge gateways read the plant once
PLCs, SCADA platforms, historians and plant systems are connected through secure edge gateways and validated data interfaces such as OPC UA and MQTT. The control logic that runs production is not modified.
A manufacturing execution system cannot be switched over on a weekend. We build the new MES beside the one you run, feed both the same PLC, SCADA and historian data, compare what they produce, and move production onto the new system work center by work center, with a way back at every step.
Both systems read the same machine data. The new one earns each work center by producing the same numbers as the system you trust, on real production, before anyone depends on it.
PLCs, SCADA platforms, historians and plant systems are connected through secure edge gateways and validated data interfaces such as OPC UA and MQTT. The control logic that runs production is not modified.
The new MES processes the same orders, counts and events as the legacy one and writes its results to its own store. Nothing on the floor changes while this runs.
Outputs of old and new are compared on real data: order status, counts, scrap, downtime reasons, OEE. A work center moves only once its numbers match and stay matched.
Which work center runs on which system is configuration, not a deployment. A station can be returned to the legacy MES between shifts while the cause is found.
Line 1 / Assembly : new // migrated, 6 weeks in production Line 1 / Paint : shadow // both systems running, outputs compared Line 2 / * : legacy // untouched, not scheduled yet
Every station sits in one of three states, and moving between them is a configuration change with a defined rollback, not a plant-wide release.
Both routes end with the legacy MES retired. They differ in what a mistake costs while you get there.
Everything after it runs on this machinery, and it produces the plan and the estimates for the next packages from your actual systems rather than from assumptions.
A solution architect maps the current MES, the interfaces it depends on, the data model and the workflows that must survive the move, with your engineer in a walkthrough session.
Edge gateway and interface setup for one work center, the delivery pipeline, environments, access control and the rollback path, plus the reconciliation checks that will decide any cutover.
The new system consumes live data from that station and produces its own counts and statuses beside the legacy MES, with the first comparison report on real production.
Work is contracted in short packages of one to three weeks. A larger milestone, such as a full line, spans several of them.
Two things are decided after the foundation stage rather than guessed now: the cutover order across work centers and lines, and how much of the integration work your automation team keeps in house with our architecture support.
A migration is judged on what does not break. These are the functions we reconcile against the legacy system before a work center moves.
Blanket discounts on AI do not survive contact with a plant. Overall project gains land around 10 to 30 percent even with near-universal tool adoption, while specific task types genuinely run twice as fast.
| Work type | AI impact | What the human keeps |
|---|---|---|
| Data models, interface definitions, scaffolding | 60–80% faster | Correctness review against the tag list |
| Converting framework-free calculation logic | 70–90% faster | Parity sign-off against the legacy results |
| Standard screens and reports | 50–60% faster | Visual QA with the people who use them |
| Operator terminal components | 40–50% faster | Usability on the floor, gloves and all |
| Scheduling, genealogy and other complex flows | ~30% faster | Business-logic validation |
| Verifying the line behaves identically | ~0% | All of it |
Why the total does not drop by 70 percent: those percentages apply to writing code. Every migrated function still needs an engineer to review the output, compare it against the running system, test the real flow, deploy and watch it. Where an automatic verdict exists, such as a reconciliation check against the legacy MES, that comparison can run continuously and the work moves at machine pace. Where the verdict is a person watching a line, verification sets the clock, and no tool removes that step safely.
From the tag on the machine to the report the plant manager opens on Monday.
Where a plant cannot send data outside its own network, the system runs entirely on premise or in a private environment, and redaction layers keep sensitive information inside approved boundaries.
Production visibility, traceability and workflow automation across multiple lines, contractors and time zones.
A custom QMS for a Central European industrial-automation manufacturer, deployed to multiple sites at once.
Tax, procurement and quality approvals moved out of spreadsheets and email without opening years of custom ERP code.
No. New and legacy systems run in parallel on real data without affecting users, and the switch-over is gradual, work center by work center, without stopping operations or risking data loss.
No. Legacy PLCs, SCADA platforms, historians and plant systems are connected through secure edge gateways and validated interfaces. The control logic is not modified, and workflow layers can sit beside the ERP rather than inside it.
Equivalence checks compare the outputs of both systems on real production data: order status, counts, scrap, downtime reasons and OEE. A work center moves only after its numbers match and keep matching under normal load.
Historical records are migrated with backups, validation checks and controlled transfers, combining automated tooling with manual review, and reconciled against the legacy system before the old one is retired.
Yes. Each package ships complete and reversible, so you can stop at any boundary with production running on a mix of both systems and resume later.
Once a solution is validated in a pilot, we replicate it across sites with structured release management, standardized processes and metrics, so the second plant is a rollout rather than a project.
Only if you want it to. The system can run fully on premise or in a private environment, and redaction layers prevent sensitive information from leaving approved boundaries.
30 minutes on your plant, your current system and its interfaces: which work center moves first, what it has to prove, and what the first two-week package would deliver.